How Many Yards of Concrete by Slab Size (12×16 to 40×80)
Select your exact building slab dimensions for instant 4", 5", 6", and 8" cubic yards (with 10% waste), monolithic perimeter footing volume, #4 rebar sticks, gravel subbase tons, and 2026 poured costs.
| Slab Size | Sq Ft | 4" Order (w/ 10%) | 6" Shop (w/ 10%) | Monolithic Edge | 2026 4" Turnkey Cost | Calculator |
|---|---|---|---|---|---|---|
| 12' × 16' Slab | 192 sf | 2.61 yd³ | 3.91 yd³ | +2.66 yd³ | $1,325–$1,997 | Open Takeoff |
| 12' × 20' Slab | 240 sf | 3.26 yd³ | 4.89 yd³ | +3.04 yd³ | $1,656–$2,496 | Open Takeoff |
| 16' × 20' Slab | 320 sf | 4.35 yd³ | 6.52 yd³ | +3.42 yd³ | $2,208–$3,328 | Open Takeoff |
| 16' × 24' Slab | 384 sf | 5.21 yd³ | 7.82 yd³ | +3.8 yd³ | $2,650–$3,994 | Open Takeoff |
| 20' × 20' Slab | 400 sf | 5.43 yd³ | 8.15 yd³ | +3.8 yd³ | $2,760–$4,160 | Open Takeoff |
| 20' × 24' Slab | 480 sf | 6.52 yd³ | 9.78 yd³ | +4.18 yd³ | $3,312–$4,992 | Open Takeoff |
| 20' × 30' Slab | 600 sf | 8.15 yd³ | 12.22 yd³ | +4.75 yd³ | $4,140–$6,240 | Open Takeoff |
| 24' × 24' Slab | 576 sf | 7.82 yd³ | 11.73 yd³ | +4.56 yd³ | $3,974–$5,990 | Open Takeoff |
| 24' × 28' Slab | 672 sf | 9.13 yd³ | 13.69 yd³ | +4.94 yd³ | $4,637–$6,989 | Open Takeoff |
| 24' × 30' Slab | 720 sf | 9.78 yd³ | 14.67 yd³ | +5.13 yd³ | $4,968–$7,488 | Open Takeoff |
| 24' × 32' Slab | 768 sf | 10.43 yd³ | 15.64 yd³ | +5.32 yd³ | $5,299–$7,987 | Open Takeoff |
| 24' × 36' Slab | 864 sf | 11.73 yd³ | 17.6 yd³ | +5.7 yd³ | $5,962–$8,986 | Open Takeoff |
| 24' × 40' Slab | 960 sf | 13.04 yd³ | 19.56 yd³ | +6.08 yd³ | $6,624–$9,984 | Open Takeoff |
| 28' × 36' Slab | 1,008 sf | 13.69 yd³ | 20.53 yd³ | +6.08 yd³ | $6,955–$10,483 | Open Takeoff |
| 28' × 40' Slab | 1,120 sf | 15.21 yd³ | 22.81 yd³ | +6.46 yd³ | $7,728–$11,648 | Open Takeoff |
| 30' × 30' Slab | 900 sf | 12.22 yd³ | 18.33 yd³ | +5.7 yd³ | $6,210–$9,360 | Open Takeoff |
| 30' × 40' Slab | 1,200 sf | 16.3 yd³ | 24.44 yd³ | +6.65 yd³ | $8,280–$12,480 | Open Takeoff |
| 30' × 48' Slab | 1,440 sf | 19.56 yd³ | 29.33 yd³ | +7.41 yd³ | $9,936–$14,976 | Open Takeoff |
| 30' × 50' Slab | 1,500 sf | 20.37 yd³ | 30.56 yd³ | +7.6 yd³ | $10,350–$15,600 | Open Takeoff |
| 30' × 60' Slab | 1,800 sf | 24.44 yd³ | 36.67 yd³ | +8.56 yd³ | $12,420–$18,720 | Open Takeoff |
| 36' × 48' Slab | 1,728 sf | 23.47 yd³ | 35.2 yd³ | +7.99 yd³ | $11,923–$17,971 | Open Takeoff |
| 40' × 40' Slab | 1,600 sf | 21.73 yd³ | 32.59 yd³ | +7.6 yd³ | $11,040–$16,640 | Open Takeoff |
| 40' × 50' Slab | 2,000 sf | 27.16 yd³ | 40.74 yd³ | +8.56 yd³ | $13,800–$20,800 | Open Takeoff |
| 40' × 60' Slab | 2,400 sf | 32.59 yd³ | 48.89 yd³ | +9.51 yd³ | $16,560–$24,960 | Open Takeoff |
| 40' × 80' Slab | 3,200 sf | 43.46 yd³ | 65.19 yd³ | +11.41 yd³ | $22,080–$33,280 | Open Takeoff |