Direct Answer: A 24'×40' (960 sq ft) slab requires 13.04 cubic yards at 4" thick (11.85 raw + 10% waste) or 19.56 cubic yards at 6" thick for a shop or vehicle lift. Add +6.08 yd³ for a 12"×18" monolithic perimeter footing.
Customize Your 24' × 40' Pour
960 Sq Ft4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.
| Slab Thickness | Flat Order (w/ 10% Waste) | With 12"×18" Monolithic Edge | Ready-Mix Trucks | Best Application |
|---|---|---|---|---|
| 4 Inches (3,500 PSI) | 13.04 yd³ | 19.1 yd³ | 2 truck(s) | Residential living area, patio, light passenger cars |
| 5 Inches (4,000 PSI) | 16.3 yd³ | 22.4 yd³ | 2 truck(s) | Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min) |
| 6 Inches (4,000 PSI) | 19.56 yd³ | 25.6 yd³ | 3 truck(s) | RV storage bays, tractors, heavy mechanic workshops |
| 8 Inches (4,500 PSI) | 26.07 yd³ | 32.1 yd³ | 3 truck(s) | Commercial fleet semi-trucks & heavy machinery |
Frequently Asked Questions — 24x40 Concrete Slabs
How many cubic yards of concrete do I need for a 24x40 slab?
A 24' × 40' (960 sq ft) slab at 4 inches thick needs 11.85 raw cubic yards, or 13.04 cubic yards with a standard 10% waste buffer (2 ready-mix trucks). At 6 inches thick for a shop or vehicle lift, order 19.56 cubic yards.
How much does a 24x40 concrete slab cost in 2026?
Ready-mix concrete delivery alone for a 4-inch 24x40 slab costs roughly $2,021 to $2,412 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (85 sticks), forming, and finishing averages $6,624 to $9,984.
How much extra concrete does a monolithic thickened edge add to a 24x40 slab?
A standard 12"-wide × 18"-deep monolithic perimeter footing around the 128 linear feet of a 24x40 slab adds approximately 6.08 cubic yards (including 10% over-excavation buffer).