Direct Answer: A 30'×30' (900 sq ft) slab requires 12.22 cubic yards at 4" thick (11.11 raw + 10% waste) or 18.33 cubic yards at 6" thick for a shop or vehicle lift. Add +5.7 yd³ for a 12"×18" monolithic perimeter footing.
Customize Your 30' × 30' Pour
900 Sq Ft4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.
| Slab Thickness | Flat Order (w/ 10% Waste) | With 12"×18" Monolithic Edge | Ready-Mix Trucks | Best Application |
|---|---|---|---|---|
| 4 Inches (3,500 PSI) | 12.22 yd³ | 17.9 yd³ | 2 truck(s) | Residential living area, patio, light passenger cars |
| 5 Inches (4,000 PSI) | 15.28 yd³ | 21.0 yd³ | 2 truck(s) | Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min) |
| 6 Inches (4,000 PSI) | 18.33 yd³ | 24.0 yd³ | 2 truck(s) | RV storage bays, tractors, heavy mechanic workshops |
| 8 Inches (4,500 PSI) | 24.44 yd³ | 30.1 yd³ | 3 truck(s) | Commercial fleet semi-trucks & heavy machinery |
Frequently Asked Questions — 30x30 Concrete Slabs
How many cubic yards of concrete do I need for a 30x30 slab?
A 30' × 30' (900 sq ft) slab at 4 inches thick needs 11.11 raw cubic yards, or 12.22 cubic yards with a standard 10% waste buffer (2 ready-mix trucks). At 6 inches thick for a shop or vehicle lift, order 18.33 cubic yards.
How much does a 30x30 concrete slab cost in 2026?
Ready-mix concrete delivery alone for a 4-inch 30x30 slab costs roughly $1,894 to $2,261 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (81 sticks), forming, and finishing averages $6,210 to $9,360.
How much extra concrete does a monolithic thickened edge add to a 30x30 slab?
A standard 12"-wide × 18"-deep monolithic perimeter footing around the 120 linear feet of a 30x30 slab adds approximately 5.7 cubic yards (including 10% over-excavation buffer).