hooliehaus
3D Room
Exact 576 Sq Ft Pour Takeoff • Full-Size Truck 2-Car Garage or Carriage House

How Many Yards of Concrete for a 24x24 Slab? (2026 Cost & Rebar)

Direct Answer: A 24'×24' (576 sq ft) slab requires 7.82 cubic yards at 4" thick (7.11 raw + 10% waste) or 11.73 cubic yards at 6" thick for a shop or vehicle lift. Add +4.56 yd³ for a 12"×18" monolithic perimeter footing.

Customize Your 24' × 24' Pour

576 Sq Ft
Slab Concrete Thickness

4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.

Exact Ready-Mix Order for 24' × 24' (4" Thick)2 Ready-Mix Trucks (9.5 yd³ each)
12.4 Cubic Yards(11.3 raw + 10% waste)
Concrete Material
$2,105
@ $170/yd³
Turnkey Poured Est.
$5k–$8k
Labor, rebar & finish
#4 Rebar (16" OC)
52 Sticks
20-ft bars + 12% lap
4" Gravel Base
12 Tons
#57 crushed stone
Pour Breakdown: Flat 4" slab = 7.11 yd³ + 96 LF monolithic perimeter footing = 4.15 yd³. Mixing by hand would require 558 bags of 80-lb concrete mix—always order ready-mix transit trucks for a 24x24 structural slab.
24x24 Concrete Slab Thickness, Monolithic Footing & 2026 Cost Matrix
Slab ThicknessFlat Order (w/ 10% Waste)With 12"×18" Monolithic EdgeReady-Mix TrucksBest Application
4 Inches (3,500 PSI)7.82 yd³12.4 yd³1 truck(s)Residential living area, patio, light passenger cars
5 Inches (4,000 PSI)9.78 yd³14.3 yd³2 truck(s)Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min)
6 Inches (4,000 PSI)11.73 yd³16.3 yd³2 truck(s)RV storage bays, tractors, heavy mechanic workshops
8 Inches (4,500 PSI)15.64 yd³20.2 yd³2 truck(s)Commercial fleet semi-trucks & heavy machinery

Frequently Asked Questions — 24x24 Concrete Slabs

How many cubic yards of concrete do I need for a 24x24 slab?

A 24' × 24' (576 sq ft) slab at 4 inches thick needs 7.11 raw cubic yards, or 7.82 cubic yards with a standard 10% waste buffer (1 ready-mix truck). At 6 inches thick for a shop or vehicle lift, order 11.73 cubic yards.

How much does a 24x24 concrete slab cost in 2026?

Ready-mix concrete delivery alone for a 4-inch 24x24 slab costs roughly $1,212 to $1,447 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (52 sticks), forming, and finishing averages $3,974 to $5,990.

How much extra concrete does a monolithic thickened edge add to a 24x24 slab?

A standard 12"-wide × 18"-deep monolithic perimeter footing around the 96 linear feet of a 24x24 slab adds approximately 4.56 cubic yards (including 10% over-excavation buffer).