2026 Barndominium Cost by State & Footprint (30×40, 40×60, 40×80)
Select your state and building size to inspect local RSMeans labor multipliers, frost-line foundation costs, wind/snow load shell specs, owner-builder savings, and turnkey GC budgets.
| State (Labor Index & Frost Line) | 30x40 (1,200 Sq Ft) | 40x60 (2,400 Sq Ft) | 40x80 (3,200 Sq Ft) |
|---|---|---|---|
Texas (TX) Labor 0.91× • 12" frost line | $130k–$210k | $259k–$420k | $346k–$560k |
Florida (FL) Labor 0.96× • 6" frost line | $146k–$235k | $293k–$470k | $390k–$627k |
North Carolina (NC) Labor 0.93× • 18" frost line | $137k–$218k | $274k–$437k | $365k–$582k |
Tennessee (TN) Labor 0.9× • 18" frost line | $132k–$209k | $264k–$418k | $352k–$557k |
Ohio (OH) Labor 0.98× • 36" frost line | $142k–$228k | $283k–$456k | $378k–$608k |
Georgia (GA) Labor 0.92× • 12" frost line | $134k–$214k | $269k–$427k | $358k–$570k |
Missouri (MO) Labor 0.94× • 30" frost line | $131k–$206k | $262k–$413k | $349k–$550k |
Indiana (IN) Labor 0.96× • 36" frost line | $137k–$218k | $274k–$437k | $365k–$582k |
Kentucky (KY) Labor 0.91× • 24" frost line | $130k–$204k | $259k–$408k | $346k–$544k |
Oklahoma (OK) Labor 0.89× • 18" frost line | $126k–$199k | $252k–$398k | $336k–$531k |
Michigan (MI) Labor 1.01× • 42" frost line | $149k–$242k | $298k–$485k | $397k–$646k |
South Carolina (SC) Labor 0.92× • 12" frost line | $134k–$216k | $269k–$432k | $358k–$576k |